Explore the route map of Delhi Meerut RRTS, The Delhi-Meerut Regional Rapid Transit System (RRTS) is an upcoming high-speed rail corridor spanning approximately 82 kilometres. This route will connect Delhi with Meerut, significantly reducing travel time to less than an hour compared to the current 2.5 to 3 hours. The project, expected to be operational by 2025, will feature trains running at speeds up to 180 km/h, with key stations at Sarai Kale Khan, Ghaziabad, and Modinagar. This initiative aims to enhance regional connectivity, boost economic activities, and provide a sustainable commuting option for the densely populated areas along the route.
Explore the Delhi Meerut rapid rail route map to see the route connecting Delhi, Ghaziabad, and Meerut.
Delhi - Ghaziabad - Meerut Regional Rapid Transit System Stations
S.N.
Station Name English
Station Name Hindi
Integration
Station Layout
Opening
1
Sarai Kale Khan - Nizamuddin
सराय काले खान - निजामुद्दीन
Pink Line Indian Railways ISBT
Elevated
2025
2
New Ashok Nagar
न्यू अशोक नगर
Blue Line
Elevated
2025
3
Anand Vihar
आनंद विहार
Blue Line Indian Railways ISBT Pink Line
Underground
2025
4
Sahibabad
साहिबाबाद
Blue Line Indian Railways
Elevated
2023
5
Ghaziabad
ग़ाज़ियाबाद
Indian Railways
Elevated
2023
6
Guldhar
गुलधर
Indian Railways
Elevated
2023
7
Duhai
दुहाई
Indian Railways
Elevated
2023
8
Murad Nagar
मुराद नगर
Indian Railways
Elevated
2025
9
Modi Nagar South
मोदीनगर दक्षिण
Indian Railways
Elevated
2025
10
Modi Nagar North
मोदीनगर उत्तर
Indian Railways
Elevated
2025
11
Meerut South
मेरठ दक्षिण
Indian Railways
Elevated
2025
12
Partapur
परतापुर
Indian Railways
Elevated
2025
13
Rithani
रिठानी
Indian Railways
Elevated
2025
14
Shatabdi Nagar
शताब्दी नगर
Indian Railways
Elevated
2025
15
Brahmpuri
ब्रह्मापुरी
Indian Railways
Elevated
2025
16
Meerut Central
मेरठ केंद्रीय
Indian Railways
Underground
2025
17
Bhaisali
भैसाली
Indian Railways
Underground
2025
18
Begumpul
बेगमपुल
Indian Railways
Underground
2025
19
MES Colony
मेस कॉलोनी
Indian Railways
Elevated
2025
20
Daurli
दौरली
Indian Railways
Elevated
2025
21
Meerut North
मेरठ उत्तर
Indian Railways
Elevated
2025
22
Modipuram
मोदीपुरम
Indian Railways
Elevated
2025
Delhi-Meerut Regional Rapid Transit System (RRTS)
The Delhi-Meerut Regional Rapid Transit System (RRTS) is a transformative infrastructure project aimed at significantly enhancing connectivity between Delhi and Meerut. This high-speed rail corridor, spanning approximately 82 kilometres, is designed to reduce travel time, promote economic growth, and provide a sustainable transportation option for the densely populated regions it serves.
Project Overview
The Delhi-Meerut RRTS is part of the larger National Capital Region Transport Corporation (NCRTC) initiative, which seeks to develop a network of rapid transit systems across the National Capital Region (NCR). This project, expected to be operational by 2025, will feature trains running at speeds of up to 180 km/h, drastically cutting the travel time between Delhi and Meerut to less than an hour, compared to the current 2.5 to 3 hours.
Route and Key Stations
The RRTS corridor will start at Sarai Kale Khan in Delhi and extend to Meerut, with 22 stations along the route. Key stations include:
Sarai Kale Khan: Serving as the main terminal in Delhi, it will connect with the Delhi Metro, Indian Railways, and ISBT (Inter-State Bus Terminal).
Ghaziabad: A major urban centre in Uttar Pradesh, this station will cater to a large commuter population.
Modinagar: An important stop that will benefit the residents and industrial units in the area.
Meerut: The terminal station, which will be split into two main stations: Meerut South and Meerut North, facilitating easy access to different parts of the city.
Infrastructure and Technology
The Delhi-Meerut RRTS will employ state-of-the-art infrastructure and advanced technology to ensure efficiency, safety, and comfort. Key features include:
High-Speed Trains: Designed to operate at a maximum speed of 180 km/h, these trains will feature modern amenities and are expected to significantly reduce travel time.
Dedicated Corridors: The project will have dedicated tracks, minimising delays and ensuring a smooth journey.
Multi-Modal Integration: Stations will be integrated with other modes of transport, including metro lines, buses, and auto-rickshaws, providing seamless connectivity.
Advanced Signalling Systems: The corridor will utilise cutting-edge signalling and communication systems to enhance safety and operational efficiency.
Economic and Social Impact
The Delhi-Meerut RRTS is expected to have a profound economic and social impact on the region. By improving connectivity, the project will facilitate easier and faster movement of people and goods, stimulating economic activities in both urban and rural areas. Key benefits include:
Job Creation: The construction and operation phases are expected to generate numerous employment opportunities.
Increased Productivity: Reduced travel time will enable commuters to save time, leading to increased productivity and better work-life balance.
Urban Development: Enhanced connectivity will spur urban development along the corridor, leading to improved infrastructure and better living standards.
Environmental Benefits
The RRTS project is designed with sustainability in mind. By providing a fast and reliable alternative to road travel, it is expected to reduce the number of vehicles on the road, thereby lowering emissions and improving air quality. Additionally, the use of electric trains will contribute to reducing the carbon footprint.
Challenges and Mitigation
Like any large-scale infrastructure project, the Delhi-Meerut RRTS faces several challenges, including land acquisition, environmental concerns, and coordination among various agencies. However, the NCRTC is taking proactive measures to address these issues, such as:
Transparent Land Acquisition Processes: Ensuring fair compensation and rehabilitation for affected landowners.
Environmental Management Plans: Implementing measures to minimise environmental impact, including the protection of green spaces and water bodies.
Stakeholder Engagement: Regular consultations with stakeholders, including local communities, to address concerns and ensure smooth project execution.
Future Prospects
The Delhi-Meerut RRTS is part of a broader vision to create a network of rapid transit systems connecting major urban centres in the NCR. Future corridors are planned to link Delhi with other key cities like Alwar, Panipat, and others, further enhancing regional connectivity and fostering balanced urban development.